In force
MDR: EU device rules apply
Including the rules under which some software becomes a medical device.
Healthcare & Life Sciences
What we would build for hospital groups, diagnostic chains, generics and active pharmaceutical ingredient manufacturers and medical device makers: patient data handled as the DPDP Act expects, administrative AI that stays clear of clinical judgement, and validated systems that hold up in an EU inspection.
For hospital groups, diagnostic chains, pharmaceutical manufacturers and medical device makers in India, at home and in their export markets in Europe.

11 August 2023
DPDP Act published
Digital personal data, including patient records held digitally, comes under one national law.
May 2027
Data Fiduciary duties apply
Notice, safeguards, breach intimation and retention rules reach hospitals and laboratories that process personal data digitally.
2 August 2028
EU AI Act: AI in medical devices
High-risk duties for AI in devices sold in the EU, under the 2026 amendment.
The Digital Personal Data Protection Act, 2023 and its Rules bring notice, consent, security safeguards and breach intimation to organisations that process patient data digitally, with the Data Fiduciary duties applying from May 2027. Access boundaries and retention therefore have to be designed, not assumed.
SourceAct No. 22 of 2023
Discharge summaries, insurance pre-authorisation, coding and referrals consume hours that belong to patients. Carefully bounded assistance can return some of that time, as long as the record remains the doctor’s own work.
Under the EU Medical Device Regulation (MDR), software that guides diagnosis or treatment may qualify as a device, and any AI within it is high-risk under the EU AI Act. Indian device makers selling into the EU must plan for both, and keeping administrative AI clearly outside that boundary is a deliberate design choice.
SourceRegulation (EU) 2017/745
Ransomware attacks on hospitals have shown the cost of recovery plans that were never tested. CERT-In expects listed cyber incidents to be reported within six hours, so segmentation and tested recovery belong in the architecture from day one.
Doctors spend their evenings completing discharge summaries and notes.
Assistance drafts discharge summaries and letters from the record and the doctor’s notes; the doctor corrects and signs, and nothing unsigned is filed.
Referrals, prescriptions and insurance forms arrive in every possible format.
Intake processing classifies each document, extracts the clinical question or the claim details and marks what is missing so staff can chase it, all with an audit trail.
Hospital, laboratory and pharmacy systems do not share a language.
Integration on HL7 FHIR, using SNOMED CT for clinical terms, built as reusable interfaces rather than a separate link for each pair of systems.
Research and analytics teams wait months for data they can use.
Pipelines that pseudonymise records, document lineage, tag purpose and control access, so each dataset carries the purpose it may serve under the DPDP Act.
Validation slows every change at a plant that supplies EU markets.
Validation scaled to risk on GAMP 5 principles, with automated tests and requirements traceable to them, so the evidence ships with each release rather than following it.
Quality, regulatory and medical knowledge is buried in thousands of controlled documents.
Search across SOPs, batch records, labels and regulatory letters that always points to the approved version of its source.
Administrative support, clinical decision support and secondary use stay separate by design, each with its own rules, approvals and evidence, over a shared interoperability layer.
Our assistance stays in the administrative zone. Clinical decision support follows a medical-device route.
One interoperability layer, built on HL7 FHIR and SNOMED CT, links three zones to the hospital information and clinical systems.
The administrative support zone holds discharge and letter drafts and the intake of coding, referrals and pre-authorisation. Nothing is written to the record until the doctor signs it off.
Clinical decision support is a separate zone: software of that kind goes through its own validation as a medical device under the EU MDR, and the EU AI Act classes it as high-risk.
Secondary use begins with approval for a stated purpose (for EU data, a permit from a health data access body). Processing happens inside a secure environment, and research teams and registries receive the results.
Drafts and suggestions never reach the record without approval from a named doctor.
Once a feature starts to steer diagnosis or treatment, it leaves the administrative track and is developed as a medical device, never slipped in as an update.
FHIR resources and shared terminology replace bespoke point-to-point interfaces.
Research data is pseudonymised and released for a recorded purpose only; EU data also needs a permit and a secure processing environment.
These dates bind products and services on the EU market, and for some the detail still waits on implementing acts. India’s own DPDP dates are at the top of this page.
In force
Including the rules under which some software becomes a medical device.
In force
Healthcare providers in the EU come within scope.
In force
In force
The consultation has closed; the final texts were not adopted at the status date.
Position on 2 October 2026
Ahead
Implementing acts fix the detailed formats.
Ahead
Covers class III and implantable class IIb devices, while a targeted MDR revision is debated.
Ahead
Applies to AI in medical devices, following the 2026 amendment.
Ahead
Patient summaries and ePrescriptions move first; health data access bodies start operating.
Ahead
Imaging, lab results and discharge reports follow.
EU instruments that reach Indian exporters, software vendors and groups with European operations. Each entry says when it applies to you and how it sits next to Indian law.
Planning orientation only, not legal, regulatory or medical advice. Indian rules are summarised as they stood on 6 November 2026; EU dates checked on 2 October 2026.
Under Article 9, EU law treats health and genetic data as special categories that may be processed only on a specific legal ground, and processing them at scale normally calls for an impact assessment. An Indian company falls within the GDPR when it offers services to people in the EU or monitors them there (Article 3(2)).
At home, the DPDP Act and Rules govern patient data, most duties from May 2027. Who may see which record, how identities are masked and how long data is kept are settled before build, and we provide the technical input for an impact assessment under either law.
SourceRegulation (EU) 2016/679, EUR-Lex (opens external site)
Grants people in the EU electronic access to their own health records, defines a shared European exchange format with requirements for EHR systems, and opens regulated research access through health data access bodies. Its duties phase in between 2027 and 2031.
It matters to Indian vendors of hospital information or EHR software with European customers: data exposed in standard formats and access logged today avoid a rebuild later.
SourceRegulation (EU) 2025/327, EUR-Lex (opens external site)
In the EU, software meant to diagnose, prevent, monitor or treat can qualify as a medical device, generally class IIa or above under the classification rule for software. Indian manufacturers reach European patients through this regime; Regulation (EU) 2023/607 gave legacy devices longer transition periods.
Intended purpose is written down at the start. Administrative tools are built to remain outside the device definition; device software is developed under a regulated lifecycle with its own technical file.
SourceRegulation (EU) 2017/745, EUR-Lex (opens external site)
AI that is itself a medical device, or protects the safety of one, counts as high-risk. Under the 2026 amendment those duties start on 2 August 2028, in step with the MDR conformity route. A provider based in India is covered once it places such a system on the EU market (Article 2(1)(a)), and must first name an authorised representative in the Union (Article 22(1)).
Where AI rules and device rules meet, one technical file should serve both. We plan it that way from the first sprint.
SourceRegulation (EU) 2024/1689, EUR-Lex (opens external site)
Annex 11 is the EU rule for computerised systems used in GMP manufacturing, relevant to Indian plants that supply medicines to the EU, and GAMP 5 is the industry’s guide to validating them by risk. Drafts of a revised Annex 11 and of a new Annex 22 covering AI appeared in July 2025.
Validation runs inside the delivery pipeline: every requirement linked to a test, evidence produced per release, and each AI use case checked against draft Annex 22.
SourceEudraLex Volume 4, European Commission (opens external site)
Hospitals and other healthcare providers in the EU, EU reference laboratories and makers of certain medical products fall within it, with duties covering risk management, incident reporting and supplier security. An Indian supplier meets it through the contracts of its European customers.
At home, CERT-In’s six-hour reporting already covers listed incidents. Network segmentation, backups and recovery drills are built into our designs, and as a supplier we feed your incident reports.
SourceDirective (EU) 2022/2555, EUR-Lex (opens external site)
A draft summary assembled from the record and notes, which the treating doctor corrects and signs.
Referrals and insurance pre-authorisation requests sorted and checked, with missing papers requested before anyone reviews them.
Adverse event reports turned into structured cases for a generics manufacturer; safety specialists assess every report.
Answers from approved SOPs and validation records at a pharma plant, always citing the version currently in force.
An assistant for bookings, report availability and general questions; any medical question goes to staff.
Patient service, medical representatives and partner programmes for hospital groups and pharma companies, while clinical data stays in the clinical systems.
Batch management, supply chain and finance for pharmaceutical plants, linked to quality and validation and to GST e-invoicing for domestic sales.
Partner tiers shown are FromNine’s own. Product names belong to their respective owners.
India
In India, the DPDP Act and Rules govern digital patient data, with the Data Fiduciary duties applying from May 2027, and CERT-In’s six-hour reporting covers listed cyber incidents.
Indian manufacturers and software vendors selling into the EU meet the MDR, EU GMP, the AI Act and, for health data of people there, the GDPR. We design data flows and validation once, with the Indian and European evidence documented side by side, so that entering a further market means new interfaces, not a new system.
It turns on the intended purpose. Assistants for notes, coding or intake are built to remain administrative, and a doctor approves each output. Should a feature start to guide diagnosis or treatment, we raise it at once and plan the device route for each market you sell into.
Wherever your legal basis and internal policies permit, typically your own environment or a cloud region you select, with the encryption keys in your hands. Before build we document flows, retention and access against the DPDP Rules and, for patients in the EU, the GDPR.
Yes. Integration is designed on HL7 FHIR with common clinical terminology, so that it can later link to national health platforms and, for European customers, to the EU exchange format, without proprietary interfaces.
Scaled to risk, on GAMP 5 principles: each requirement linked to an automated test, evidence produced per release, and change control your quality unit can walk an inspector through.
Sometimes it will be. So drafts are never filed without the doctor’s signature, low-confidence extractions are sent for review, and quality is checked against the agreed test sets ahead of and after every release.
Reducing documentation load, preparing patient data flows for May 2027 or renewing a validated system for an EU market? Begin with one workflow and the rules that govern it.